Blog - South Bay Signal

Title
Go to content

Caltrain CP Alameda And CP Shark Cutover

South Bay Signal
Published by in South Bay Signal News ·
Another successful cutover with Modern Railway Systems as part of the Caltrain Electrification Project. CP Shark and CP Alameda cutover, and PTC tested successfully and on schedule.


911 LAKEVILLE STREET, #354
PETALUMA, CA 94952
(408) 569-5698
Back to content