SF MUNI SUNSET TUNNEL PROJECT
Project Team: Balfour Beatty
Project Description: Installation of new track, overhead catenary and signaling in the Sunset Tunnel, Installation of new TWC cases for traffic signal pre-emption
Services Provided: Design of Sunset Tunnel signal system, design of VTS/TWC cases, factory acceptance testing of signal cases, field testing/cutover of signal cases, signal maintainer training
MUNI Test Train During Sunset Tunnel Construction
Train-To-Wayside (VTS) Signal Cases During Factory Testing
MUNI Train Approaching New TWC/VTS Loops
Sunset Tunnel Signal System Case
Wayside Signal At Sunset Tunnel Entrance