MN HLRT PLATFORM EXTENSION PROJECT
Project Team: Sheehy Construction; Premier Electric Corporation
Railroad: MN Metro Transit Light Rail
Project Description: Extending of station platforms, including relocation of wayside signals, pedestrian crossing signals and track circuits. Project also included installation of wheel axle counter systems for reverse run operation and new electric locks on two crossovers.
Services Provided: Field Signal Engineer, Field/Cutover Testing, Signal Maintainer Training
Test Train Passing Through Crossing
Franklin Station Pedestrian Crossing
Wiring New Electric Locks
Relocated Block Signal
Pulling New Signal Cables
Installing Wheel Axle Counters
Train Approaching 50th Street Station
50th Street Station Pedestrian Crossing Signal