CHICAGO TRANSIT AUTHORITY RED LINE RECONSTRUCTION PROJECT
Project Team: Aldridge Electric, SECA IRC
Railroads: Chicago Transit Authority
Project Description: Reconstruction of Red Line trackwork, removal and re-installation of signal equipment, re-testing of signal locations
Services Provided: Preparation of test procedures and test forms, assist with field testing/cutover


CTA Red Line Signal House
Cable Installation On New Trackwork


Rail Train Moving New Rail Through Project Area
Interlocking Local Control Panel


Wayside Signal With Route Request Lever Box
Work Equipment Traveling Through The Project